Light that candle!

Post Reply
Message
Author
User avatar
TheGreenGoblin
Chief Pilot
Chief Pilot
Posts: 17596
Joined: Thu Aug 08, 2019 11:02 pm
Location: With the Water People near Trappist-1

Light that candle!

#1 Post by TheGreenGoblin » Wed Jan 13, 2021 2:49 pm

NASA's SLS rocket core stage will soon be test fired

The SLS is NASA's go-to rocket to send astronauts to the moon by 2024 as part of its Artemis program. Artemis 1 is the first of what's expected to be a series of missions leading up to Artemis 3, NASA's first crewed moon landing since the Apollo era.

In the upcoming hot-fire engine test, engineers will load the Boeing-built SLS core booster with over 700,000 gallons of cryogenic (that's really cold) propellant into the rocket's fuel tanks and light all four of its RS-25 engines at once. The engines will fire for 485 seconds (a little over 8 minutes) and generate a whopping 1.6 million pounds of thrust throughout the test.

"This test will demonstrate that this newly designed and developed core stage is ready for launch," SLS stage manager Julie Bassler said today (Jan. 12) during a news conference. "Testing provides an opportunity to learn and make sure that the rocket is ready to fly astronauts to the moon."

Prior to the hot fire test, the megarocket underwent two "wet dress rehearsals," during which engineers loaded, controlled and drained propellant into the rocket's tanks. And, while the rocket's core stage "performed well," during one of these trials on Dec. 20, the test ended early without explanation, which caused this hot-fire test to be delayed, according to a NASA statement. An earlier fueling attempt in December was stalled due to temperature issues. The testing campaign also faced delays due to a number of tropical storms and hurricanes and precautions to reduce the spread of COVID-19 amidst the pandemic.


"We learned a great deal from these two wet dress rehearsal tests," Bassler said. "As a result of those we did revise some of our procedures, and specifically updated our terminal countdown sequence." Additionally, Bassler added, the extra testing allowed engineers to gain more confidence in its processes, ground equipment and hardware.

Following this upcoming hot fire test, the team behind the test will "need several days to analyze the data and determine if we are ready to move forward with refurbishing the core stage and shipping to Kennedy," Bassler said.

"We're being very careful with it as we go," vice president and SLS program manager at Boeing John Shannon said during the same news conference. If there are unexpected results with this upcoming test, "we'll just take the time required to make sure we are treating this flight article appropriately and in continuing to march forward," Shannon added. "We're heading into it [this hot-fire test] with a mindset of we are learning and if we need to stop and regroup and then press forward, we will absolutely do that."

Following the success of this hot fire test and subsequent uncrewed missions to the moon, "the next key step in returning astronauts to the moon and eventually going on to Mars," Jeff Zotti, the RS-25 program director at Aerojet Rocketdyne said during the news conference.

NASA's SLS program manager John Honeycutt agreed.

"This powerful rocket is going to put us in a position to be ready to support the agency in the country's deep space mission to the moon and beyond," he said.

https://www.msn.com/en-gb/money/technol ... d=msedgdhp
Though you remain
Convinced
"To be alive
You must have somewhere
To go
Your destination remains
Elusive."

Post Reply